OIA BP-425 International Arrival Passenger Processing

OIA BP-425 International Arrival Passenger Processing

Architect: KBJ Architects

Total Cost: $12,000,000

Sector: Aviation 

Improvements for International Arriving Passenger Processing (IAPP) at the Orlando International Airport. This project was a design/build project for a new conditioned sterile corridor from the existing Airside 1 Federal Inspection Station (FIS) on the first level to a new vertical core escalator and elevator to the second floor transfer level Automated People Mover (APM) station. The APM stations at Airside 1 and Landside Terminal were modified to maintain a secure exit path for the international passengers. The scope also included new curtain walls with automatic sliding glass doors, signage, security systems, finishes, related fire protection, and utility systems.